
Property details
-
District
Ilha da Madeira -
County
Câmara de Lobos -
Locality
Câmara de Lobos
-
Area
125 m²
-
Price
440.000 € -
Energy Rating
A+
-
Property code
905_D
Description
We present this building with only 4 apartments of types T2 and T3, featuring an incredible panoramic view. It boasts a privileged location, just 7 minutes from the center of Câmara de Lobos.
This unit is located on the ground floor and is distributed as follows:
Suite - 14.60 m²
Suite Bathroom - 4.40 m²
Circulation - 3.00 m²
Social Bathroom - 6.50 m²
Bedroom - 12.00 m²
Storage - 13.00 m²
Living Room - 23.00 m²
Laundry - 2.35 m²
Kitchen - 8.00 m²
Balcony 1 - 13.70 m²
Balcony 2 - 13.80 m²
2 Parking Spaces
Development Highlights:
Comfort and Modern Design
High-quality Dakmar vinyl flooring in all living areas
White PVC skirting boards (70 mm x 11 mm)
Smooth walls and ceilings painted with water-based Magnolia paint
Kitchen and Laundry
White thermolaminated wood furniture
Silestone or similar stone countertop, white color
Bosch appliances: induction stove, ceiling extractor, microwave, and oven
Stainless steel sink
Practical laundry area
Contemporary Bathrooms
Large ceramic tile cladding (1200 x 60 mm on walls and 60 x 60 mm on floors)
Suspended wooden cabinet with integrated sink
White Sanindusa sanitary ware
Bedrooms and Wardrobes
Bedrooms with intelligent storage
Sliding door wardrobes, white lacquered, with beige linen melamine interior
Vinyl flooring
Other Features
Natural ventilation through windows
270-liter heat pump from LG or similar
Reinforced sheet metal entrance door
PVC windows with double glazing for better thermal and acoustic insulation
Outdoor Areas
Non-slip ceramic tile flooring (60 x 60 mm or larger)
Privileged Location
Located in a quiet area of Câmara de Lobos, the building benefits from excellent sun exposure and easy access to the expressway, allowing quick travel to Funchal and other parts of the island. Proximity to schools, supermarkets, and essential services makes this location ideal for families.
Expected Completion
Construction is in an advanced stage, with completion expected by October 2025. This is the perfect opportunity to personalize some finishes to your taste and secure a home that reflects your lifestyle.
For more information or to schedule a visit, please contact us.
We are available to answer all your questions and present this magnificent project to you!